• Home
  • About
  • Services
    • Analysis
    • Plasterwork/Render Surveys
    • Ruin Conservation
    • Training
    • International Support
  • Blog
  • Contact Us

Back to Blog List

September 23rd 2022

Share|Twitter|Facebook|Email

|

Recording Main Hall ceiling before demolition

M Womersleys have just finished measuring, calculating radiuses, removing decorative ribs and details, and drawing the main hall ceiling at Kedleston Training Centre before it is lost in demolition work, to allow its recreation in the future.

September 23rd 2022

Share|Twitter|Facebook|Email

Back to Blog List

Related Articles

Report on the most appropriate way to repair a stone plinth Gillygate York

Report on the most appropriate way to repair a stone plinth Gillygate York

M. Womersleys were asked by the owner of a property on Gillygate as to the best way to repair the plinth…

Read Full Article >
A scheme for the repair of the listed Barn and Granary perpendicular to Lily Hall,  June 2026

A scheme for the repair of the listed Barn and Granary perpendicular to Lily Hall, June 2026

Introduction M Womersleys were asked to prepare a scheme for the repair of the listed barn …

Read Full Article >
Bramhall Hall Initial findings after the plaster collection from the upper Solar Chamber

Bramhall Hall Initial findings after the plaster collection from the upper Solar Chamber

M Womersleys were asked to look at the makeup of the plaster in the Ball Room in the South Wing (Figures…

Read Full Article >

M.Womersleys Historic Building Specialists

T:

Office 2.18, Holmfield Mills, Holdsworth Road, Halifax, HX3 6SN

01422 730040

M: 07802 549634

Copyright © 2026 M.Womersleys | website by TVW