• Home
  • About
  • Services
    • Analysis
    • Plasterwork/Render Surveys
    • Ruin Conservation
    • Training
    • International Support
  • Blog
  • Contact Us

Back to Blog List

September 14th 2021

Share|Twitter|Facebook|Email

|

Mark finishes his second year of PhD research

Mark has just finished his second year of PhD fieldwork at the Monasteries and churches around Lake Tana. Now on to the preparation of more thesis chapters about local Vernacular and Church Architecture, and the wonderful painted churches.

September 14th 2021

Share|Twitter|Facebook|Email

Back to Blog List

Related Articles

A scheme for the repair of the listed Barn and Granary perpendicular to Lily Hall,  June 2026

A scheme for the repair of the listed Barn and Granary perpendicular to Lily Hall, June 2026

Introduction M Womersleys were asked to prepare a scheme for the repair of the listed barn …

Read Full Article >
Bramhall Hall Initial findings after the plaster collection from the upper Solar Chamber

Bramhall Hall Initial findings after the plaster collection from the upper Solar Chamber

M Womersleys were asked to look at the makeup of the plaster in the Ball Room in the South Wing (Figures…

Read Full Article >
Paint analysis of a limited number of samples taken at Hall i’th Wood Museum, Hall i’th Wood Lane, Bolton

Paint analysis of a limited number of samples taken at Hall i’th Wood Museum, Hall i’th Wood Lane, Bolton

M Womersleys were asked to undertake some paint sampling at Hall i'th Wood Museum. Originally, this …

Read Full Article >

M.Womersleys Historic Building Specialists

T:

Office 2.18, Holmfield Mills, Holdsworth Road, Halifax, HX3 6SN

01422 730040

M: 07802 549634

Copyright © 2026 M.Womersleys | website by TVW