Helping the Canal and River Trust Volunteers
Womersleys helped guide volunteers working for the Canal and River Trust in the repointing and selective rebuilding of a Turnover Bridge (canal bridge number 100) at Stone on the Trent and Mersey Canal. The bridge was erected Circa 1818. The group did really well in their efforts to continue to conserve the structure.
It is built 1 ½ red bricks wide with stone saddle-back copings to parapets. Of single span with elliptical arch. A 'roving' bridge with swept parapets on south side and ramps down to tow-paths to allow horses pulling the barges to continue without being untethered from the barges.
The bridge had bricks put back where they were missing and was pointed up using NHL5 lime, local washed river sand and ironstone sand. The volunteers removed very hard cement over pointing before they started that was near 40-50 newtons per square mm in compressive strength and repointed with a lime mortar that will eventually achieve 5-7 newtons. This mix will resist the wetness that parapets always suffer from but is a lot more vapour permeable than the old cement pointing and would cause failure and salt damage in the hard brick from which the bridge is built.
Related Articles
Bramhall Hall Initial findings after the plaster collection from the upper Solar Chamber
M Womersleys were asked to look at the makeup of the plaster in the Ball Room in the South Wing (Figures…
Paint analysis of a limited number of samples taken at Hall i’th Wood Museum, Hall i’th Wood Lane, Bolton
M Womersleys were asked to undertake some paint sampling at Hall i'th Wood Museum. Originally, this …
Conservation cleaning, metal work and masonry repairs at the cemetery of St John the Divine
M Womersleys have just finished assisting students and tutors with conservation cleaning, metal work…